Railway Line Equipment for Bejaia, Algeria|  December 2018

20190104_084706

Project description

Full Onshore / Offshore operations for rail line project from Spain to Algeria.

Commodity: Railway line equipment. Weight: 1,425 tons. Volume: 1.860 cbm

Execution time: December 2018

Work Scope:
All onshore and offshore activities from EXW Workshop Spain, up to CFR Bejaia, Algeria.
Pick up cargo, includes special road transport. Customs clearance at both ends. Surveyor inspection at POL/POD. Loading and unloading operations at POL/POD terminals. Sea freight. Cargo Insurance arrangements. All administrative activities to arrange the operations at origin/destination.

Origin: Asturias, Spain
Destination: Bejaia, Algeria.