3 shipments (of a total of 10) for a project of 30.000 cbm aprox.
Loading of metallic structures for a Combined Cycle Plant (CCGT) in Koudiet
Commodity: Metallic structures for Combined Cycle Plant Koudiet in Algeria with a total weight of 1.958.000 Kgs and 7.000 cbm of volume (3 shipments)
Execution time: from February until June 2011 (3 shipments)
Work scope: Loading, stowing and lashing of the cargo in the vessel in the port of Castellón
Shipment 1: February 2011 - 846 Mton = 2.665 cbm
Shipment 2: April 2011 - 589 Mton = 2.237 cbm
Shipment 3: June 2011 - 523 Mton = 2.098 cbm
Origin: Castellón, Spain
Destination: Annaba, Algeria
Total weight and volume of the 3 shipments: 1.958 Mton and 7.000 cbm