First shipment (of a total of 10) for a project of 30.000 cbm aprox.
521 metallic structures for Combined Cycle Plant (CCGT) in Koudiet
Unloading vessel and delivery in site of 4.500 Mtons and 12.800 cbm of pipes (on shore) for Pumping Plant in Vinaroz, Valencia (Spain)
Loading in factory, transport until port of Avilés, loading, stowing and lashing of 5 pieces of one Central Hydraulic Power
First of a total of 6 or 7 shipments, for the transport until Mostaganem (Algeria) from the pipeline channeling and substations for a seawater desalination plant
Transport of components for the constructions of a Combined Cycle Plant from Rotterdam to site in Soto de Ribera, Asturias, Spain.
Unloading vessel, special transport and delivery in site of one heater of 71 Mtons.
Transport of 2 Trafos (electrical transformers) from Sevilla to Rotterdam
Loading in factory, special transport to port, receipt, loading, stowage, documentary formalities, chartering of the vessel, unloading of Puerto Cabello, and special transport until 9 end sites of 27 modular trolley stations for mass transport system at Venezuela.