Loading in factory, transport until port of Avilés, loading, stowing and lashing of 5 pieces of one Central Hydraulic Power
Commodity: Pieces of Central Hydraulic Power
Execution time: June and July 2010
Work scope: Two shipments with handling of the pieces in the factory, loading on hydraulic platform and transportation until pier of Avilés, monitoring, stowing and lashing
Origin: Carreño, Asturias (Spain)
Destination: Yedigoze (Turkey)
Weight and Volume: 2 shipments of 132 Tons each one and 168,393 cbm
Exceptionals pieces: 2 Valves of 106 Tons each one
and measures: 7,16 meters long x 6,80 meters wide x 1,81 meters high
1 cuff of 11,5 Tons and measures: 5,80 x 5,80 x 2.01 meters