Loading in factory, special transport to port, receipt, loading, stowage, documentary formalities, chartering of the vessel, unloading of Puerto Cabello, and special transport until 9 end sites of 27 modular trolley stations for mass transport system at Venezuela.
Commodity: Modular trolley stations for mass transport system in Barquisimeto city, Venezuela.
Execution time of the project: December 2009 - February 2010
Work scope: Loading in supplier's factory, special transport to El Musel port (Gijón), receipt, loading, stowage, documentary facilities, chartering of the vessel from El Musel port (Gijón) to Puerto Cabello (Venezuela), official studies of the routes, unloading in Puerto Cabello, transfer to second area, special transport from Puerto Cabello and unloading 9 end sites (3 modules per site).
Origin: Gijón, Asturias, Spain
Destination: Barquisimeto, Venezuela
Weight and volume: 517.500 Kgs. and 6.335 cbm (first shipment)
Exceptionals pieces:
Módulos A and C: 4,75 x 3,90 x 13 meters, weight 17,5 and 16,5 Mtons.
Módulo B: 4,75 x 3.90 x 12 meters and 16 Mtons of weight.