Loading, stowing, lashing, coordination and control over pre-carriage of 11 complete wind mills from Pontevedra (Spain) to Canela (Chile).
Commodity: 11 wind mills
Execution time: May - July 2007
Work scope:
Origin: Carballino y Ponteareas. Pontevedra (Spain)
Destination: Canela (Chile)
Weight / Volume: 137 packs with 1.825 Tons / 11.298 cbm
Exceptionals pieces:
1) measures: 30,17 x 4,20 x 2,30 meters
2) measures: 19,88 x 4,20 x 4,20 meters