Project listing

2006

  • [Dryer for a paper mill]

    Dryer for a paper mill

    Unloading a 71 Mton paper dryer, 6 meters long and with a diameter of 4,6 meters at the port of Bilbao (Spain).
    Land transport coordination to the Buñuel (Navarra) mill.

  • [Evaportaion system]

    Evaportaion system

    Transport coordination from factory to the port of Bilbao and loading operations of a black liquor evaporation system on the vessel, destined for a paper mill in Ghizhou (P.R. China).

  • [Urban tunnel in Guayaquil]

    Urban tunnel in Guayaquil

    Special transport coordination of two “Jumbo” tunnel drills by OHL from Seseña (Toledo) to the port of Bilbao, chartering on M/V “Ocean Luck” up to the port of Guayaquil and delivery in work site to built urban tunnels in San Eduardo’s hill.
    Total: 40,5 Tons / 180 m3 / Dimensions: 16,83 x 2,90 x 3,68 meters each unit.

  • [Tunnel boring machine for line 9 of Barcelona Underground]

    Tunnel boring machine for line 9 of Barcelona Underground

    Ship’s agency of the vessel M/V “Aquilea” from the river port of Chalon Sur Saone to Barcelona and unloading a 77 Tons component for the tunnel boring machine used to build line 9 of Barcelona Underground.
    Total: 77.000 Kgs.

  • [Water purifier]

    Water purifier

    Turnkey project. Water purifier disassembled into four pieces from Minessotta (USA) to the Tarragona plant.
    Total: 54.000 Kgs.